Second Baikal tunnel opens on Russia’s BAM - International Railway Journal

[Reportage, Informationsverbund]
von AIM

A second tunnel through the Baikal mountains on the Baikal-Amur Main Line opened on July 28. The tunnel and associated track doubling alleviates a major bottleneck.